MULTIMEDIA

The last 100 metres of the wooden trail left to build +

The last 100 metres of the wooden trail left to build

Nature reserve director Dmitry Gorshkov inspects the students’ work in the last days of construction +

Nature reserve director Dmitry Gorshkov inspects the students’ work in the last days of construction

The last batch of wooden planks delivered +

The last batch of wooden planks delivered

The most difficult section of the eco trail is over +

The most difficult section of the eco trail is over

Dmitry Gorshkov, director of the Sikhote-Alin Nature Reserve +

Dmitry Gorshkov, director of the Sikhote-Alin Nature Reserve

Applying the finishing touches to the refurbished viewing point +

Applying the finishing touches to the refurbished viewing point

The eco trail goes through the marshy area of the reserve +

The eco trail goes through the marshy area of the reserve